  • Well drilling - drilling and pipe - pump installation operations should be carried out by qualified and expert persons with professional competence and equipment.
  • Under no circumstances should the wells be cleaned and developed by giving high air pressure with a compressor.
  • PVC Drilling Pipes are required to comply with TS11794 standard.
  • A ground survey should be carried out before drilling a borehole.
  • Drill pipe and column pipe should be selected according to the pump to be used. The diameter of the well to be drilled must be suitable for the drill pipe.
  • Pipes should not be hit against each other and the ground. They should not be dragged away.
  • Pipes should be checked before being lowered into the well and defective pipes should not be used.
  • Pipe male thread covers should not be removed until the moment of installation.
  • During installation, the threads of the pipes should be smeared with soft soap to facilitate grooving.
  • Grease and similar oils should not be applied to the threads of the pipes during installation.
  • When grooving the pipes, a rubber tightening wrench should be used.
  • Wrenches that can damage the pipe such as chain wrenches should not be used while grooving the pipes.
  • If drill pipes get stuck while lowering into the well, they should not be continued. Pipes should be removed and lowered after re-dredging with drilling tools.
  • In order for the drill pipes to stand upright in the well, they should be pulled up and suspended at least 10 cm after they touch the bottom.
  • Graveling should be done slowly and evenly around the pipe to avoid bridging during graveling.
  • The submersible pump should be installed below the dynamic level.
  • Submersible pumps should be positioned above the level of the filtered pipe. Otherwise, the submersible pump may draw in sand and the pipelines on the surface may be damaged in a short time.
  • The pump column pipe should be fixed on the metal stand pipe, not on the drill pipe

SDR

Pipe Depth Classification

Pipe Critical Collapse Pressure

SN

 

 

Pkr (Bar)

kN/m²

21

100 m Series

7.7

27

17

300 m Series

14.8

55

13.5

500 m Series

32

112